As I mentioned in the previous post - choose your contractors carefully. A red light already lit up while discussing the process of shaping bathroom floor and showers out of concrete. Unfortunately the light was too dim and we ran into some trouble.

We had the master bathroom floor raised to accommodate radiant floor heating that we used instead of a towel-hanger wall radiator. We used the same connection but routed the pipes in the floor. The floor was supposed to be a compacted, waterproof concrete with a depression in the shower.
The result were terrible!

We have also had a base created for mounting the bathtub faucet. After this we decided to demolish it and integrate it with the sink cabinet.
We had some of the drywall work done, plumbing for the toilets and shower mixers and were supposed to have the bathroom tiling done. The beautiful hand made mosaic did not arrive in time so we decided to let the contractors go and look for somebody else in the meantime.