As with every element of this project we spent a considerable amount of time designing, testing, and eventually building it. Below is a sample of countless sketches and scribbles of the sink concepts. I am starting with the sinks because apart from demolition (done a year earlier) we knew that the concrete would have needed time to cure and our original plan was to get done with the entire project in 3-4 months. As it turned out later - a very naïve assumption.
But the sinks needed to be started first.